So what is on our plate(s)?
FINISH THE KITCHEN, 90% COMPLETE
- install bead-board ceiling with trim (75%)
- install back-splash (75%)
- install shelves (100%)
- install base boards (100%)
- install kick plates on cabinets (100%)
- install pot rack/shelf (100%)
- Paint/sand wall patches (100%)
- Plug up the original hood electric connection (100%)
- Install pendant light fixture (100%)
- Install new ceiling fan (100%)
- Fix plumbing to pass inspection (100%)
NEW: THE PANTRY, 50% COMPLETE
- Build lower & upper cabinets (50%)
- Research/build folding,rolling, library ladder (100%)
- Clean out pantry, paint, and prep for new cabinets (50%)
- Determine solution for floor (100%)
FINISH THE LIVING ROOM, 95% COMPLETE
- Decorate!
- install crown molding
- Frame window
/install shelf install mini-blinds & curtains
- Attack the entry way and install wainscoting
NEW: THE DINING ROOM, 5 % COMPLETE
- Apply wainscoting
- Paint, re-apply woodwork and additional molding (5%)
- Decorate!
FINISH OLIVE’S ROOM, 99.9% COMPLETE
- paint radiator
- Decorate (100%)
- Build reading nook in closet (100%)
- paint closet and decorate (100%)
- install radiator (clean radiator) (100%)
- install electric outlets (100%)
- put ceiling fan blades back on (100%)
- remove wall paper & paint. (100%)
FINISH OUR ROOM, 50% COMPLETE
paint- Install molding
- Decorate
- finish electric (100%)
- fix wall patch from electric (100%)
- install ceiling fan (100%)
- return broken AC unit (100%)
NEW-ish: FINISH OFFICE ELI’S ROOM, 75% COMPLETE
- Convert closet to changing station (50%)
- ignore crap-tastic wall paper and closet door (100%)
- apply second coat of finish to floors (100%)
- paint for baby boy (100%)
- decorate and set up nursery (100%)
NEW: THE BASEMENT, 80% COMPLETE
- Detail work!
- build fireplace mantle and built-in book shelves (25%)
- Draft floor plan for general room, laundry room, and bathroom. (Confirm budget.) (100%)
- Remove all of our junk (100%)
- Waterproof (100%)
- run electric (100%)
- run gas / install heater (100%)
- install lighting (100%)
- Frame, drywall, tape, mud, and paint (100%)
- order/install doors (100%)
- Carpet/floor (100%)
PERMIT LIST, 100% COMPLETE
- exterior solar lights installed
- Garage door step replace/repaired
- Knob-n-tube wiring removed/replaced in attic
- Hot water heater properly vented and installed to code
- Replace broken attic window
- Dryer vented properly
- Roof
- install new water heater
EXTERIOR, 2% COMPLETE
NEW: Install FenceNEW: Landscape front yard- NEW: Fix first attempt at landscaping
- NEW: Landscape/clean up yard
Clean & Organize garage- Install wooden playset for kids
- Replace all windows (10%)
- Paint siding OR install vinyl
- Have tree inspected/removed
NEW: THE MUD ROOM, 48% COMPLETE
- Build Recycle-able’s cabinet
run gas/ install heater (25%)- Build lockers or some
kind of storage system for shoes/coats(50%) - Install new banister
- install new floor by door and stairs to basement
Turn current basement doorinto a sliding barn door (?)- Decorate!
Paint,apply woodwork and additional molding (75%)Clean up room(100%)Install Attic fold-able ladder(100%)Install new floor on top landing(100%)
There are many other minor tasks that are part of our list, but these would be boring and a bit overwhelming to read., so I will add these once the bigger tasks are completed.
Pingback: Chugging Along; Everything in a Nut Shell | SNODGANISTAN
Pingback: Our Newest Addition. « SNODGANISTAN
Pingback: If I had more time and money…. | SNODGANISTAN
Pingback: A new list. | SNODGANISTAN